SEA DEFENCE
People have tried to control erosion and flooding for many hundreds of years,
with varied success. There are a number of alternatives when there is an erosion
or flooding problem
1. Do nothing
2. build sea walls etc at the edge of the sea
3. build forward e.g. groynes, beach nourishment
4. build off shore defences e.g. offshore bars or breakwater
FACTORS TO CONSIDER
1. Cost of the scheme and up keep costs
2. Benefits of the scheme e.g. homes, farmland, roads and lives
3. How effective is the scheme
4. What effect will it have on other areas
5. What will it look like
6. Who pays. In low-lying areas the N.R.A. is responsible and in high areas
it is the local council. The government will give a grant if it accepts that
the scheme is needed.
| DEFENCE | COST | ADVANTAGES and DISADVANTAGES |
| Sea wall | £6000 per m | Very strong,but may reflect waves,causing turbulence and undercutting . Very expensive |
| Rock revetment | £4500 per m | Absorbs the energy
of the waves. Over time the rocks break up. Unsightly |
| Offshore bar | £5000 per m | Protects the base
of the cliff. Must be large rocks or will be moved by storms |
| Groynes | £5000 each | Trap sand if there
is any to trap. Steal sand 100m apart from beaches downdrift increasing erosion |
| Beach nourishment | £3500 per m | Absorbs wave action. May need replacing |
Best with groynes.
These figures are very approximate as factors such as supply of sand/ rocks ,ease of access etc must be taken into account.
Hard Engineering
Soft Engineering
|
Sea walls
|
![]() |
![]() |
Hard Engineering
|
Beach nourishment
|
![]() |
RED LINE POLICY
In some areas the councils have accepted that they cannot afford to protect the coast. Waveney council in Suffolk has draw a line to the north of Southwold, where building is not allowed and no protection will occur. This means the loss of a village and farmland. There is no compensation . North Norfolk council has done the same.
SHORELINE MANAGEMENT PLANS
Until recently coastal management
plans were piecemeal. Each area looked after its own part of the coast, which
caused problems for adjacent areas. In 1995 MAFF encouraged the development
of a more integrated approach in the form of SMP's/ They are made of sediment
cells e.g. the coast from Hengistbury Had to Hurst Castle spit in Hampshire.
Stage 1 Collect data about processes and defenses, land use and ecosystems
Stage 2 Management objections set }
Stage 3 Plan preparation } Consultation
Stage 4 Review }
Within each cell will be management units e.g. a town or farming area.
MANAGED RETREAT OF THE COAST
In the past high flood tides and surges were absorbed by salt marshes along
the coast. Over the years, these areas were reclaimed to create fertile
farmland e.g. in the Fens, Romney Marsh and Pett Level, Thames Esturary,
polders of the Netherlands etc. This was seeen as very important after the
food shortages of the Second World War.
From time to time these areas are flooded by the sea, and have been
protected by higher and higher sea walls and other defences [ see Stour
notes] . As sea level rises owing of the Greenhouse effect it will cost
increasing amounts to protect this land. There has been a food surplus in the
EU recently so the fertile land is less highly valued.
In some places managed retreat is being used. This allows part of the sea
wall to be destroyed and the land behind is flooded during high spring tides
until it reverts to salt marsh. This takes about 50 years. This land is seen
as
being expendable.
BLACKWATER ESTUARY
This process is being tried on parts of the Blackwater estuary.
At Northey Island, the sea wall has been allowed to decay and the land
behind is flooded at spring tides. A new lower sea wall has been built on
higher land to protect the rest of the farm. The change has to be managed or
the tidal currents could suck out mud and not deposit it.
Near Bradwell on Sea, a break has been made in the sea wall to allow a
similar process to occur.
The salt marsh provides a new habitat for wading birds and other creatures:-
e.g. brent geese, curlew, shelduck, oyster catchers, crabs, cockles and
mussels.
JAYWICK 1986
Jaywick is on a low-lying part of the coast of Essex. just to the south of Clacton.
It was developed after W.W.I when many people from London bought plots of this
land to build holiday homes. At first these were often wooden shacks with no
mains water, electricity or sewage. The roads were unmade and some of them still
are. Gradually the population increased and permanent homes were built behind
the holiday homes [some of which were replaced by brick buildings]. In 1953
the surge breached the sea wall and flood much of the area. 35 people drowned
and 600 were made homeless. The sea wall was improved after that ,but there
has been minor flooding every year since and 1n 1978 and 1982 people had to
be evacuated. 2000 homes plus chalets and caravans are in danger and the old
sea wall was falling apart. The Anglian Water Authority was responsible so a
study was carried out in 1985 when Middlesex poly kept a record of wind ,wave
and tidal details over the year. A cost benefit study was done for the protection
of 200 ha against flooding to a 1 : 1000 year standard. The findings were
Conditions that lead to most damage were
1. Largest waves[up to 2.5 m] from the N and NE hit the beach without refraction
so there is longshore drift southwards.
2. Surge conditions affect this area when winds come from the N or NE.
3. Storm waves can move material up to 0.2mm up to 200 m offshore. In 1983 the
entire beach near Eastness was removed in one storm and the wall had to be protected
by rocks.
4. The loss of beach material means that the waves hit the sea wall weakening
it.
5. The greater depth of water increases the strength of the waves.
6. Once picked up the tidal currents can remove the sediment as they flow over
the beach. The tidal currents can reach 1m/sec which is unusually high.
Options;-
1. Conventional wall improvements £14.7 million
2. Beach recharge without breakwaters £11.4 million
3. Beach recharge with breakwaters £9.6 million
4. Do nothing [ not possible as lives were at risk ]
Benefit i.e. homes, caravans, tourist trade etc £13.6 million over 60
years
Cost : Benefit ratio = 1 : 1.4
Scheme chosen
Beach;- 10 m wide and the crest will be 1.3m above spring high tide so it will
absorb all the wave energy. 180 000 tonnes of fairly coarse sand and medium
at gravel was used as it is less likely to move. This had to be brought from
the sea as local roads were too poor to carry the traffic. However some of it
has moved downdrift between groynes. In the first year 6% of the sand was lost
and all may need replacing in 9 years due to natural processes.The sea wall
is 300mm above the beach to cope with the 1 : 1000 year surge level
Breakwaters ;- 300m long , built of large rocks[6-8 tonne] of Swedish granite that should not move in storms. They are built in a fish tail shape to refract the waves to limit longshore drift and to push the tidal currents off the beach, creating a protected beach cell. They are placed at the weakest points of the coast to give extra protection.
NE NORFOLK
The coast is made of glacial deposits which are easily eroded. Between 1838
and 1861 4m p.a. were lost. At Overstrand and Sidestrand are being eroded at
1m p.a. at the moment.
Reasons;-
1. Cliffs are 45 -60 m high with chalk between glacial deposits so slumping
occurs in clay areas.
2. Local farm ponds drain water into the cliffs.
3. There is a 3000km fetch to the North which produces large waves that undercut
the cliffs and transport the collapsed material.
4. The longshore drift carries material towards Lowestoft.
Problem
1. There is an increase in the local population.
2. Roads will need re-routing
3. Upset for local people who may loose their homes.
Work so far
1. Seawalls and groynes have been built at Cromer and Overstrand. The walls
are built to last 100 years, but are expensive and only worthwhile for inhabited
areas. At Overstrand the steep wall causes turbulence and scour ,which is undermining
the sea wall.
2. Revetments were built at Trimingham in 1973 but were destroyed when the cliff
slumped.
3. Revetments and 4 groynes were built at Sidestrand in 1985 at a cost of £1
million
4. Tube wells have been put into the cliffs between Overstrand and Cromer to
drain the water away.
Options at Sidestrand
1. Revetments and groynes would decrease erosion by 50%
2. Beach nourishment
3. Nothing and forbid building within 1 km of the cliff
MAPPLETON
Mappleton is on the Holdeness coast and the cliffs are made of boulder clay
and were eroding very quickly. The village was in danger, and several houses
had been lost. However the B1242 road link was in danger and this made it economically
viable to build sea defences. An offshore bar of granite was built at the cost
of £ 2 million. This prevented erosion at Mappleton but prevented material
moving southwards.
At Cowden erosion was less than 2m
p.a. until the Mappleton defences were put in place . In two years, an acre
of land has been lost, and the coast has eroded 80m.
Sue Earle's farmhouse was knocked down in 1997 as it was at the cliff edge and
was considered dangerous. It cost the Earle's £3000 for the priveledge.
They are now suing in court.
MAPPLETON
Mappleton is on the Holdeness coast and the cliffs are made of boulder clay
and were eroding very quickly. The village was in danger, and several houses
had been lost. However the B1242 road link was in danger and this made it economically
viable to build sea defences. An offshore bar of granite was built at the cost
of £ 2 million. This prevented erosion at Mappleton but prevented material
moving southwards.
At Cowden erosion was less than 2m
p.a. until the Mappleton defences were put in place . In two years, an acre
of land has been lost, and the coast has eroded 80m.
Sue Earle's farmhouse was knocked down in 1997 as it was at the cliff edge and
was considered dangerous. It cost the Earle's £3000 for the priveledge.
They are now suing in court.
FAIRLIGHT COVE
This grew up in the interwar years with holiday shacks being built at first.
These have been replaced by brick buildings and many retired people have moved
here.In 1990 the average price was £100 000.
The cliffs are a mixture of clay
with siltstone/sandstone beds and erosion is especially fast along the fault
lines.
Between 198 -87 the cliff retreated 1 - 2 m per year, but the rate is increasing
as clay is being exposed at the base. Some places have experienced more rapid
erosion and since 1984 one house has lost 32 ft of their garden. Four coastguard
houses have gone and others have lost their gardens. One house was rolled back
40 ft to prevent its loss. Forty six houses will be lost in the next 100 years.
Date of survey distance in m from grid reference
| (881,122) | (882,123) | (883,124) | |
| 1872 | 114 | 111 | 104 |
| 1907 | 88 | 81 | 93 |
| 1928 | 73 | 71 | 70 |
| 1937 | 64 | 68 | 68 |
| 1961 | 55 | 55 | 53 |
| 1986 | 26 | 40 | 65 |
Local residents state that the sea defences at Hastings 5 km to the west have increased erosion by trapping sediment by a large groyne system and harbour wall. A sediment gate has been opened in the terminal groyne.
Processes
1. Slumping of the clay cliffs
2. Mudflows down the face of the cliff
3. Undercutting of the base by the waves
Schemes
1. Offshore rock bar which would protect 11 houses for 75 years at a cost of
£2 million
2. Artificial beach and groynes for £10 million
3. Sea wall to save 35 houses for £10 million
Council argued that only 5 houses would be protected in the next few years and that the cost was greater than the benefit. They said that it would mean a 17% increase in the rates or no spending on council house repairs in order to pay for it. They felt that people knew of the danger when they bought the houses. A survey shows that in the next 100 years a stable bay will be created between the fault lines and erosion will become much slower. They argued that natural processes should be allowed to take their course.
Residents association commissioned
another cost benefit analysis to make their case. The benefits included
1. A greater rate of erosion was expected so more homes 57 in 100 years would
be lost
2. At that time they expected house prices to rise quickly [they actually fell].
3. Roads would be lost and need replacing
4. The sewer works would need replacing
5. The water ring main would need replacing
6. The electricity sub station would need replacing
7. There were intangibles that could not be quantified
· risk to life
· loss of recreational use
· stress and anxiety
· landscape loss
8. Once the erosion reach the stream it will cascade over the cliff increasing
the rate of erosion.
the .
Residents association estimated the total benefit to be £2 - £3.5
million
They, also, suggested that the cost could be reduced to about £1.5 million
This made the cost benefit analysis 1:1.4
The cliff at Farilight Cove was a
geological Site of Special Scientific Interest, so some erosion had to be allowed
in order to expose the cliff face.
After many years of argument, the rock offshore bar was built in 1990
BARTON ON SEA
Barton on Sea is built on a cliff of clay under sand, and this has eroded rapidly[
1m p.a.]. This was the result of
1. A high energy wave environment with large waves from the SW. The waves create
an under tow that removes beach material. The cliff is undercut and slumping
occurs.
2. Longshore drift from W to E.
3. Dredging offfshore starves Barton beach
4. Groyne systems to the west starve Barton beach
5. Sub aerial processes affect the face of the cliff e.g. wind action and run
off.
In the 1960's the New Forest council
built a scheme based on drainage of the groundwater and protection of the cliff
foot by rocks and steel piles. This scheme cost about £ 1 million and
protected about 1800m of coast by 1968.
For a while people were confident and even extended their homes, but in the
1970's the cliff became unstable and erosion began to occur at the foot of the
cliff. Too little material was being brought from the west to create beaches
that would protect the cliff and the sea defences.
In Feb 1974 a bad storm occurred which breached the revetment and saturated
the undercliff,damaging 200m of the cliff foot defences. During November the
cliff began to collapse pushing some of the sheet piles seawards and allowing
the revetment to collapse. the scheme was designed so that the different parts
depended on each other to work and if one part was broken the rest could not
function. During the spring of 1975, more erosion took place and several houses
were lost.
To repair the defences would cost £166 000and this might only last a few
years. Geologists were against the stabalisation of the cliff as erosion exposed
fossils of the Tertiary era and it was a site of international importance as
well as an S.S.SI.The attitude of the council and engineers changed and they
began looking at soft not hard defences. Beach nourishment is now used to absorb
the energy of the waves. The top of the cliff will be allowed to retreat until
it is at a sustainable angle.
COST BENEFIT ANALYSIS
This was done after the scheme was built.
| A. Costs of adopted scheme | ||
| 1. Capital and maintenance (64 - 71 ) | £1 263 441 | |
| 2. Capital costs[post construction] | £ 36 400 | |
| 3. Replacements of components | £ 88 145 | |
| 4. Annual maintenance charges | £ 309 600 | |
| £ 1 697 586 | ||
| 5. Not quantified | loss of golf course | |
| destruction of habitats and SSSI | ||
| visual intrusion | ||
| B. Benefits of the scheme | ||
| 1. Property preservation | £ 51 763 | |
| 2. Recreation | £ 66 696 | |
| 3. Car park revenues saved | £ 5 105 | |
| 4. Increased beach hut revenues | £ 2 500 | |
| 5. Rate income saved | £ 5 880 | |
| 6. Protection of part of the golf course | £ 927 | |
| £ 132 871 | ||
| C. Cost of no protection policy | ||
| 1. Loss of property | £ 51 763 | |
| 2. Loss of car park revenues | £ 5 105 | |
| 3. Loss of rate income | £ 5 880 | |
| 4. Loss of golf course | £ 927 | |
| £ 63 675 | ||
| D. Benefits of no protection policy | ||
| 1. Recreation [nominal value] | £ 66 696 | |
| 2. Preservation of habitats and SSSI | ? | |
| £ 66 696 [Multiply by 10 for today's costs ] |
||
Note :-
1. Would this solution have been considered if a cost benefit analysis had been
done before. {Remember the government will only pay 50% if the cost is less
than the benefit}
2. The benefits were counted on maximum recession that was possible.
3. The interest rate assumed was 10%.
4. The recreational value was worked out as
number of visitors x distance travelled in cost terms
5. Should you use the property value with or without the scheme in place.
6. How do you value an SSSI , the scenery or the upset to local people [there
is no
compensation for loss of land/home by coastal erosion]
7. What will be the cost of the scheme elsewhere e.g. if this eroded material
protects
another site will there be increased erosion if the scheme goes ahead.
LATER DEFENCES
Since 1974 the wooden groynes have
been replaced with seven rock strong points about 400m apart. These are more
able to resist storm waves.
The old timber revetments were replaced by a 1.8 km long rock revetment in 1991
at the cost of £4.5 million. [ designed to last 30 years]. New fan shaped
drains were put in the cliff in 1995 and some of the cliff has been regarded
to make it less steep. The free face of the cliff will be allowed to retreat
by weathering until it is stable.
The cost since 1987 is £ 4.5 mill
No defenses have been built at Naish farm to the west as the cost benefit analysis
was 6:1. The site is an SSSI and the geology and fossils are of scientific interest,
so it must be exposed. The erosion at Naish farm provides sediment for Barton
and Hurst Castle spit.
Since 1954 Hurst Castle spit has been beached several times and it has moved
100m inland since 1898. The spit has been protected at the proximal end with
rock armour and the crest ridge has been widened to 6m with a1:3 slope. The
increase in breaching may be the result of the protection of Barton on Sea as
there is less sediment moved by longshore drift.